Library Construction Notice

Work on an ADA compliant restroom on the first floor of the library has begun.

At this time the back entrance to the library is not accessible.

Entry at the front of the library is available.

Due to the construction, the book drop has been moved to the front of the library.  Any material, books, audiobooks, DVDs, etc., may be placed in the book drop.